- A design if needed to be modified more then 40 shall be charged accordingly
- Government fees for the liaison bodies to be paid directly by the client
- The complete fee payment for plan sanction in Panchayat limits need to be borne by client
- Assuming the site & road level to be equal, if the ground level needs to be raised above 18”, it shall be charged for accordingly
- Hard rock/soft rock excavation, if it arises shall be charged for accordingly
- Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actual
- There is no basic price/ cap of steel or cement. However, in case there is huge fluctuation of over 45% of the average market price during the signing of the agreement the difference shall be charged in consultation with the client
- Any work not mentioned within this package or outside the site boundary shall be charged for accordingly
- Percentage of openings for doors & windows – 27% Maximum
- One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
- SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 5 Feet, any increase in depth shall be charged accordingly on actuals upon site conditions
- If there is constraints in material delivery or socking place and materials to be order in small quantities, the additional charges for the same shall be charged on actuals
- A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
- Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.